What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 10 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Immingham CHP | £20.91 |
| 2 | F & S Energy #02 | £20.15 |
| 3 | Native River | £19.90 |
| 4 | Thame Road | £16.83 |
| 5 | West Burton B 3 | £14.79 |
| 6 | Broadditch | £12.80 |
| 7 | Carrington Ltd - 1 | £11.57 |
| Region | £/MWh |
|---|---|
| South Western | £19.9 |
| Eastern | £15.3 |
| South Eastern | £12.8 |
| Midlands | £10.9 |