What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 30 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Holes Bay | £126.78 |
| 2 | Zenobe Capenhurst #1 | £112.88 |
| 3 | Pembroke 31 | £107.25 |
| 4 | Unit 3 | £103.95 |
| 5 | Cottam Development Centre | £100.60 |
| 6 | Grain | £80.53 |
| Region | £/MWh |
|---|---|
| Southern | £126.8 |
| Merseyside and North Wales | £112.9 |