What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 47 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Richborough Park 1 | £61.49 |
| 2 | Limejump Energy #02 | £55.27 |
| 3 | Limejump Energy #04 | £51.56 |
| 4 | Limejump Energy #03 | £47.81 |
| 5 | ClayTye Farm 1 | £45.40 |
| 6 | Limejump Energy #01 | £39.64 |
| 7 | BGI Trading #01 | £38.57 |
| Region | £/MWh |
|---|---|
| South Eastern | £61.5 |
| Eastern | £42.4 |