What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 17 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | HawkersHill | £4.30 |
| 2 | Immingham CHP | £4.26 |
| 3 | Carrington Ltd - 2 | £3.52 |
| 4 | Bloxwich | £3.50 |
| 5 | F & S Energy #01 | £3.50 |
| 6 | Port of Tyne | £3.50 |
| 7 | Unit 1 | £3.33 |