What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 11 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Hawthorn Pit | £9.37 |
| 2 | Wormald Green | £8.75 |
| 3 | UKPR S East | £8.10 |
| 4 | Marchwood | £6.68 |
| 5 | SUNDON | £6.34 |
| 6 | Enfield Centre Ltd BMU1 | £6.33 |
| 7 | Pivot Coventry | £6.30 |
| Region | £/MWh |
|---|---|
| Northern | £9.0 |
| Eastern | £6.3 |
| Midlands | £6.3 |
| South Eastern | £6.0 |
| South Western | £5.6 |