What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 38 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Jamesfield 2 | £9.75 |
| 2 | EDFE Aggregate N Scot 1 | £9.52 |
| 3 | Hawthorn Pit | £8.00 |
| 4 | Medway | £5.39 |
| 5 | Pivot Kemsley | £4.67 |
| Region | £/MWh |
|---|---|
| North Scotland | £9.8 |
| Northern | £8.0 |
| South Eastern | £4.7 |