What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 29 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Statkraft Markets #02 | £13.00 |
| 2 | EDFE Aggregate N Scot 1 | £12.09 |
| 3 | Jamesfield 2 | £11.33 |
| 4 | Peterhead Block 1 | £8.74 |
| 5 | Broadditch | £7.77 |
| 6 | Keadby-2 Main | £6.16 |
| 7 | Medway | £5.24 |
| Region | £/MWh |
|---|---|
| North Scotland | £11.3 |
| South Eastern | £6.2 |