What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 16 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Lakeside | £7.70 |
| 2 | Keadby-2 Main | £7.09 |
| 3 | Marchwood | £6.87 |
| 4 | Immingham CHP | £6.61 |
| 5 | Unit 1 | £6.39 |
| 6 | Pembroke 11 | £6.33 |
| Region | £/MWh |
|---|---|
| Yorkshire | £7.7 |