What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 16 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Limejump Energy #04 | £3.78 |
| 2 | Bloxwich | £3.32 |
| 3 | Cowley | £3.00 |
| 4 | Pen y Cymoedd | £3.00 |
| 5 | Immingham CHP | £2.98 |
| 6 | Marchwood | £2.76 |
| 7 | Wormald Green | £2.74 |
| Region | £/MWh |
|---|---|
| South Wales | £3.0 |
| Northern | £2.7 |
| South Eastern | £2.7 |
| Eastern | £2.6 |
| Midlands | £2.6 |