What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 3 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 2 | £179.23 |
| 2 | Dollymans | £150.80 |
| 3 | Didcot B main 5 | £133.63 |
| 4 | Pivot Coventry | £92.38 |
| 5 | Hawthorn Pit | £77.66 |
| 6 | Pivot Bustleholme | £74.36 |
| 7 | Pembroke 51 | £72.97 |
| Region | £/MWh |
|---|---|
| Eastern | £150.8 |
| Midlands | £82.1 |
| Northern | £73.5 |
| South Western | £39.2 |