What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 13 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 11 | £24.25 |
| 2 | Carrington Ltd - 2 | £18.45 |
| 3 | Carrington Ltd - 1 | £18.21 |
| 4 | Richborough Park 2 | £17.09 |
| 5 | Pembroke 31 | £16.90 |
| 6 | Limejump Energy #03 | £16.80 |
| 7 | Limejump Energy #02 | £16.79 |
| Region | £/MWh |
|---|---|
| South Eastern | £17.1 |
| Yorkshire | £13.6 |