What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 27 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 11 | £31.77 |
| 2 | Keadby-2 Main | £31.00 |
| 3 | Seabank Module 2 | £25.37 |
| 4 | Langage | £20.00 |
| 5 | Rocksavage | £19.11 |
| 6 | F & S Energy #01 | £16.33 |
| 7 | Bloxwich | £16.07 |
| Region | £/MWh |
|---|---|
| Midlands | £16.1 |
| Northern | £16.0 |
| Eastern | £13.8 |
| South Wales | £13.5 |
| South Western | £12.8 |