What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 41 | £48.93 |
| 2 | Pembroke 11 | £45.52 |
| 3 | Pembroke 21 | £45.51 |
| 4 | Carrington Ltd - 2 | £44.79 |
| 5 | Carrington Ltd - 1 | £44.35 |
| 6 | Lakeside | £42.60 |
| 7 | Kings Lynn A | £41.66 |
| Region | £/MWh |
|---|---|
| Yorkshire | £42.6 |