What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Lakeside | £24.26 |
| 2 | Grain | £23.19 |
| 3 | Immingham CHP | £22.88 |
| 4 | Unit 3 | £19.26 |
| Region | £/MWh |
|---|---|
| Yorkshire | £24.3 |