What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 30 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Bloxwich | £20.06 |
| 2 | Statkraft Markets #01 | £19.00 |
| 3 | Wormald Green | £17.84 |
| 4 | Keadby-2 Main | £17.70 |
| 5 | Hunningley Stairfoot | £17.19 |
| 6 | Staythorpe 3 | £15.71 |
| 7 | Cottam Development Centre | £14.94 |
| Region | £/MWh |
|---|---|
| Midlands | £20.1 |
| Northern | £17.8 |
| Yorkshire | £17.2 |
| South Wales | £14.7 |