What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 13 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Grain | £30.09 |
| 2 | Keadby-2 Main | £29.81 |
| 3 | Flexitricity #02 | £13.42 |
| 4 | Flexitricity #03 | £13.42 |
| 5 | Flexitricity #03 | £13.42 |
| 6 | Coryton | £13.41 |
| 7 | Lakeside | £12.90 |
| Region | £/MWh |
|---|---|
| Yorkshire | £12.9 |
| Midlands | £6.1 |
| South Wales | £2.9 |