What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 22 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Statkraft Markets #4 | £254.42 |
| 2 | Spalding | £219.99 |
| 3 | Keadby-2 Main | £210.00 |
| 4 | Shoreham | £208.40 |
| 5 | Didcot B main 6 | £196.38 |
| 6 | Marchwood | £196.33 |
| 7 | Unit 1 | £163.64 |
| Region | £/MWh |
|---|---|
| Northern | £89.4 |
| South Eastern | £89.1 |
| Merseyside and North Wales | £80.4 |
| South Wales | £78.3 |
| Eastern | £74.5 |
| Midlands | £69.4 |
| South Western | £56.8 |