What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 53 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Fasnakyle G1 | £11.42 |
| 2 | Finlarig | £11.39 |
| 3 | Lakeside | £10.04 |
| 4 | Fasnakyle G3 | £9.00 |
| 5 | Fasnakyle G2 | £9.00 |
| Region | £/MWh |
|---|---|
| Yorkshire | £10.0 |