What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | THURROCK STORAGE #3 | £27.24 |
| 2 | Tebworth Park | £22.83 |
| 3 | F & S Energy #03 | £21.81 |
| 4 | Hawthorn Pit | £19.63 |
| 5 | Rocksavage | £19.07 |
| 6 | Dong Severn Ut 10 | £17.98 |
| 7 | Damhead Creek | £17.17 |
| Region | £/MWh |
|---|---|
| South Eastern | £27.2 |
| Eastern | £22.8 |
| Northern | £17.5 |