What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 17 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Native River | £0.44 |
| 2 | Tebworth Park | £0.43 |
| 3 | F & S Energy #03 | £0.43 |
| 4 | Sizing John | £0.43 |
| 5 | Rock Farm | £0.20 |
| 6 | Burwell 1 | £0.18 |
| Region | £/MWh |
|---|---|
| South Western | £0.4 |
| Eastern | £0.4 |
| Midlands | £0.2 |