What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 34 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Grain | £34.09 |
| 2 | Keadby-2 Main | £33.04 |
| 3 | THURROCK STORAGE #1 | £29.39 |
| 4 | Skelmersdale | £28.12 |
| 5 | Sizing John | £28.05 |
| 6 | Dong Severn Ut 10 | £25.76 |
| Region | £/MWh |
|---|---|
| South Eastern | £29.4 |
| North Western | £28.1 |
| Eastern | £28.0 |