What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 24 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Sizing John | £25.84 |
| 2 | Harestanes | £22.00 |
| 3 | Whitelee 1 | £22.00 |
| 4 | F & S Energy #03 | £19.39 |
| 5 | UKPR S East | £18.53 |
| 6 | UKPR East Mids | £18.50 |
| 7 | Carnegie Road 1 | £18.35 |
| Region | £/MWh |
|---|---|
| Eastern | £25.8 |
| South Scotland | £22.0 |
| Merseyside and North Wales | £18.4 |