What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 27 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £4.00 |
| 2 | Buxton | £3.50 |
| 3 | Dong Severn Ut 10 | £3.47 |
| 4 | BGI Trading #1 | £3.43 |
| 5 | BMUid for Sutton Bridge | £3.11 |
| 6 | Unit 3 | £3.03 |
| 7 | Contego | £2.93 |
| Region | £/MWh |
|---|---|
| North Western | £3.5 |
| South Eastern | £2.9 |
| Southern | £2.7 |