What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 6 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Coryton | £5.90 |
| 2 | Brigg | £5.63 |
| 3 | Swangate | £3.94 |
| 4 | Centrica Business Solutions S05L | £3.65 |
| 5 | Monk Fryston | £1.89 |
| 6 | Lakeside | £1.83 |
| 7 | Hirwaun | £0.41 |
| Region | £/MWh |
|---|---|
| Yorkshire | £5.1 |
| South Wales | £0.4 |
| Midlands | £0.4 |