What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 35 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £26.32 |
| 2 | Grain | £26.24 |
| 3 | Marchwood | £26.00 |
| 4 | Didcot B main 5 | £25.00 |
| 5 | Cottam Development Centre | £24.08 |
| 6 | Shoreham | £23.81 |
| 7 | Carrington Ltd - 2 | £21.41 |
| Region | £/MWh |
|---|---|
| Yorkshire | £18.0 |