What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Cottam Development Centre | £53.82 |
| 2 | Grain | £53.81 |
| 3 | Didcot B main 5 | £53.77 |
| 4 | Unit 1 | £53.76 |
| 5 | Peterborough 3 | £53.68 |
| 6 | GridBeyond L0DN | £53.65 |
| 7 | Little Barford main 1 | £53.65 |