What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 4 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Bloxwich | £8.24 |
| 2 | Rocksavage | £6.74 |
| 3 | GridBeyond L0DN | £4.31 |
| 4 | Damhead Creek | £3.05 |
| 5 | Shoreham | £3.02 |
| 6 | Centrica Business Solutions S05L | £2.83 |
| 7 | Carrington Ltd - 2 | £1.98 |
| Region | £/MWh |
|---|---|
| Midlands | £8.2 |
| South Eastern | £1.3 |
| Yorkshire | £0.6 |