What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 38 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £20.13 |
| 2 | Dong Severn Ut 10 | £18.10 |
| 3 | Sizing John | £13.65 |
| 4 | Tebworth Park | £12.96 |
| 5 | Carnegie Road 1 | £10.18 |
| 6 | Port of Tyne | £9.11 |
| 7 | Exergy Solutions E00E | £8.71 |
| Region | £/MWh |
|---|---|
| Eastern | £13.4 |
| Merseyside and North Wales | £10.2 |
| Northern | £8.5 |