What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Tebworth Park | £4.66 |
| 2 | F & S Energy #02 | £3.31 |
| 3 | THURROCK STORAGE #1 | £2.18 |
| 4 | Port of Tyne | £0.52 |
| 5 | Statkraft Markets #01 | £0.25 |
| Region | £/MWh |
|---|---|
| Eastern | £4.7 |
| South Eastern | £2.2 |
| Northern | £0.5 |