What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 58 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 1 | £18.66 |
| 2 | Drax | £16.10 |
| 3 | SOUTH HUMBER BANK P/S | £15.37 |
| 4 | Lakeside | £13.23 |
| 5 | Swangate | £13.00 |
| 6 | Immingham CHP | £12.54 |
| 7 | Keadby-2 Main | £12.50 |
| Region | £/MWh |
|---|---|
| Yorkshire | £13.2 |