What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 6 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Native River | £1.38 |
| 2 | SSE Energy Supply #01 | £1.24 |
| 3 | Tebworth Park | £1.14 |
| 4 | Shoreham | £1.14 |
| Region | £/MWh |
|---|---|
| South Western | £1.4 |
| Eastern | £1.1 |