What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Jamesfield 2 | £3.34 |
| 2 | Marchwood | £3.30 |
| 3 | Flexitricity #01 | £3.19 |
| 4 | Port of Tyne | £3.15 |
| 5 | Roaring Hill | £3.14 |
| 6 | Lakeside | £3.12 |
| 7 | Swangate | £3.00 |
| Region | £/MWh |
|---|---|
| North Scotland | £3.3 |
| Northern | £3.1 |
| South Scotland | £3.1 |
| Yorkshire | £3.1 |
| North Western | £3.0 |
| South Wales | £2.7 |