What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 40 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Langage | £15.15 |
| 2 | SOUTH HUMBER BANK P/S | £14.56 |
| 3 | Tye Lane | £14.42 |
| 4 | Grain | £13.08 |
| 5 | EDFE Aggregate S Eng 02 | £12.60 |
| 6 | Larks Green | £12.32 |
| 7 | Damhead Creek | £11.11 |
| Region | £/MWh |
|---|---|
| Eastern | £14.4 |
| South Western | £12.3 |
| Midlands | £10.5 |