What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 27 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Immingham CHP | £20.67 |
| 2 | Centrica Business Solutions S05L | £13.30 |
| 3 | Statkraft Markets #4 | £11.73 |
| 4 | Didcot B main 5 | £10.94 |
| 5 | Unit 2 | £10.55 |
| 6 | Pillswood 2 | £9.54 |
| 7 | Seabank Module 2 | £9.00 |
| Region | £/MWh |
|---|---|
| Yorkshire | £9.1 |