What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 16 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pillswood 2 | £15.67 |
| 2 | Carnegie Road 1 | £14.33 |
| 3 | SSE Energy Supply #01 | £13.65 |
| 4 | Broadditch | £12.12 |
| 5 | Great Yarmouth | £11.00 |
| 6 | Hunningley Stairfoot | £10.03 |
| 7 | Grain | £9.42 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £14.3 |
| South Eastern | £12.1 |
| Yorkshire | £10.5 |
| Northern | £9.3 |
| South Wales | £8.8 |
| South Western | £8.4 |