What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 17 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 6 | £3.00 |
| 2 | Little Barford main 1 | £2.25 |
| 3 | GridBeyond L0DN | £2.18 |
| 4 | West Burton B 1 | £1.63 |
| 5 | SOUTH HUMBER BANK P/S | £1.50 |
| 6 | Exergy Solutions E00E | £0.63 |