What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 24 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Little Barford main 1 | £65.74 |
| 2 | Unit 3 | £64.72 |
| 3 | West Burton B 1 | £60.64 |
| 4 | Flexitricity #04 | £56.58 |
| 5 | Dinorwig | £54.03 |
| 6 | Peterborough 3 | £53.00 |
| 7 | Flexitricity #05 | £51.47 |
| Region | £/MWh |
|---|---|
| South Scotland | £46.8 |