What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 40 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Tye Lane | £19.03 |
| 2 | Pivot Kemsley | £17.80 |
| 3 | SUNDON | £17.00 |
| 4 | EDFE Aggregate S Eng 02 | £16.59 |
| Region | £/MWh |
|---|---|
| Eastern | £19.0 |
| South Eastern | £17.8 |