What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 26 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Clachan G1 | £0.67 |
| 2 | Seabank Module | £0.67 |
| 3 | GridBeyond L0DN | £0.64 |
| 4 | Fasnakyle G3 | £0.60 |
| 5 | Carrington Ltd - 1 | £0.47 |
| 6 | Carrington Ltd - 2 | £0.44 |
| 7 | Ilmer Lane | £0.44 |
| Region | £/MWh |
|---|---|
| Eastern | £0.4 |