What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 16 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Little Barford main 1 | £35.50 |
| 2 | GridBeyond L0DN | £26.85 |
| 3 | Medway | £24.82 |
| 4 | Smartestenergy #03 | £24.59 |