What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 18 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 3 | £30.84 |
| 2 | GridBeyond L0DN | £25.78 |
| 3 | Carrington Ltd - 2 | £21.34 |
| 4 | SOUTH HUMBER BANK P/S | £20.07 |
| 5 | Flexitricity #01 | £16.61 |
| 6 | Flexitricity #04 | £13.10 |
| 7 | Flexitricity #03 | £12.90 |
| Region | £/MWh |
|---|---|
| South Wales | £11.3 |
| South Western | £11.2 |