What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 54 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Great Yarmouth | £27.38 |
| 2 | Didcot B main 6 | £26.17 |
| 3 | Didcot B main 5 | £24.61 |
| 4 | Unit 3 | £24.20 |
| 5 | Kings Lynn A | £22.25 |
| 6 | GridBeyond L0DN | £21.06 |
| 7 | Carrington Ltd - 2 | £18.31 |
| Region | £/MWh |
|---|---|
| South Wales | £14.5 |
| South Western | £13.7 |
| Northern | £10.9 |