What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 17 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £1.55 |
| 2 | Port of Tyne | £1.02 |
| 3 | F & S Energy #01 | £1.00 |
| 4 | Bloxwich | £0.96 |
| 5 | Pembroke 11 | £0.95 |
| 6 | Pembroke 21 | £0.95 |
| 7 | Grain | £0.85 |