What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 37 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £215.10 |
| 2 | KGL 1 | £211.16 |
| 3 | Staythorpe 3 | £206.75 |
| 4 | SOUTH HUMBER BANK P/S | £170.82 |
| 5 | SOUTH HUMBER BANK P/S | £170.82 |
| 6 | Peak Gen Exeter | £159.23 |
| 7 | Peak Gen Branksome | £159.00 |
| Region | £/MWh |
|---|---|
| North Western | £143.7 |
| South Eastern | £135.4 |
| Merseyside and North Wales | £133.3 |
| Eastern | £132.4 |