What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 22 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 6 | £136.94 |
| 2 | Keadby-2 Main | £119.38 |
| 3 | Blackpool | £52.70 |
| 4 | Foyers | £49.15 |
| 5 | Nursling | £25.43 |
| 6 | Pivot Kemsley | £22.94 |
| 7 | Statkraft Markets #01 | £17.70 |
| Region | £/MWh |
|---|---|
| Southern | £25.4 |
| South Eastern | £22.9 |