What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 40 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | KGL 1 | £19.25 |
| 2 | SOUTH HUMBER BANK P/S | £17.84 |
| 3 | Medway | £16.23 |
| 4 | Dollymans | £12.64 |
| 5 | Carrington Ltd - 2 | £12.15 |
| 6 | Flexitricity #03 | £12.13 |
| 7 | Flexitricity #03 | £12.13 |
| Region | £/MWh |
|---|---|
| Eastern | £12.6 |
| South Eastern | £8.9 |