What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 26 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 11 | £26.81 |
| 2 | Pivot Kemsley | £21.00 |
| 3 | Keadby-2 Main | £20.25 |
| 4 | Grain | £19.26 |
| 5 | Dollymans | £18.47 |
| 6 | F & S Energy #02 | £17.00 |
| 7 | Bloxwich | £16.29 |
| Region | £/MWh |
|---|---|
| Eastern | £18.5 |
| Midlands | £16.3 |
| Northern | £13.6 |
| South Eastern | £12.3 |
| South Western | £11.8 |