What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 1 accepted unit with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dollymans | £5675.51 |
| 2 | Staythorpe 3 | £1045.31 |
| 3 | Immingham CHP | £1031.91 |
| 4 | Statkraft Markets #04 | £140.72 |
| Region | £/MWh |
|---|---|
| Eastern | £5675.5 |