What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 7 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Staythorpe 2 | £726.25 |
| 2 | Staythorpe 4 | £726.25 |
| 3 | Immingham CHP | £711.06 |
| 4 | Marchwood | £651.64 |
| 5 | Grain | £604.29 |
| 6 | Grain | £599.23 |
| 7 | Grain | £599.22 |
| Region | £/MWh |
|---|---|
| South Eastern | £596.8 |
| Southern | £582.5 |