What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Peterhead Block 1 | £29.97 |
| 2 | Unit 2 | £18.34 |
| 3 | Port of Tyne | £17.00 |
| 4 | F & S Energy #01 | £16.83 |
| 5 | Dollymans | £14.17 |
| 6 | Wishaw | £12.90 |
| 7 | Centrica Business Solutions S06B | £12.76 |
| Region | £/MWh |
|---|---|
| Eastern | £14.2 |
| South Scotland | £12.9 |
| South Western | £11.7 |
| Northern | £7.2 |
| North Western | £5.1 |